Gypsum Manufacturing Plant

Construction commenced at the gypsum mining facility approximately one hour away, encompassing the entire plant from start to finish. Subsequently, Superior initiated the construction of phase two, focusing on the unloading and storage facilities at the processing plant. We installed and poured in place the floors and walls of a truck unloading pit measuring 60’ x 60’ x 25’ and an unloading tunnel that spans 460‘ and features a 10.5-degree slope. Between these structures, product is fed to the 420’ x 150‘ storage building, encompassing a 456’ tunnel and various conveyor systems to provide the processing plant.

¿Listo para construir?

De cualquier tamaño o alcance, nos encantaría trabajar con usted en su próximo proyecto.

Más proyectos

Soil Conservation Dam Rehab

Location: Rice, TX

Type: Dam

Yards of concrete: 2,588

Pounds of rebar: 316,610

Completion: 2024

Frac Sand Processing Plant, Colorado

Location: Keenesburg, CO

Type: Aggregate

Yards of concrete: 9,088

Pounds of rebar: 708,664

Anchor bolts: 2,317

Completion: Current