Gypsum Mining & Manufacturing Plant

Location: Arizona

Yards of concrete: 5,258

Pounds of rebar: 961,115

Anchor bolts: 1,229

Completion: 2025

 

Descripción

Construction commenced at the gypsum mining facility approximately one hour away, encompassing the entire plant from start to finish. Subsequently, Superior initiated the construction of phase two, focusing on the unloading and storage facilities at the processing plant. We installed and poured in place the floors and walls of a truck unloading pit measuring 60’ x 60’ x 25’ and an unloading tunnel that spans 460‘ and features a 10.5-degree slope. Between these structures, product is fed to the 420’ x 150‘ storage building, encompassing a 456’ tunnel and various conveyor systems to provide the processing plant.

Más proyectos

Cement Clinker Dome

Location: San Antonio, TX

Type: Cement

Yards of concrete: 1,373

Pounds of rebar: 258,767

Completion: 2025

Frac Sand Processing Plant, Colorado

Location: Keenesburg, CO

Type: Aggregate

Yards of concrete: 9,088

Pounds of rebar: 708,664

Anchor bolts: 2,317

Completion: Current

Planta de producción de piedra triturada del norte de Texas

Location: North Texas

Type: Aggregate

Yards of concrete: 16,986

Pounds of rebar: 3,645,098

Anchor bolts: 2,982

Completion: 2020