Gypsum Manufacturing Plant

Construction commenced at the gypsum mining facility approximately one hour away, encompassing the entire plant from start to finish. Subsequently, Superior initiated the construction of phase two, focusing on the unloading and storage facilities at the processing plant. We installed and poured in place the floors and walls of a truck unloading pit measuring 60’ x 60’ x 25’ and an unloading tunnel that spans 460‘ and features a 10.5-degree slope. Between these structures, product is fed to the 420’ x 150‘ storage building, encompassing a 456’ tunnel and various conveyor systems to provide the processing plant.

Ready to build?

Any size or scope—we’d love to work with you on your next project.

More Projects

North Texas Crushed Stone Production Facility

Location: North Texas

Type: Aggregate

Yards of concrete: 16,986

Pounds of rebar: 3,645,098

Anchor bolts: 2,982

Completion: 2020

South Central Texas Crushed Stone Processing and Rail Load Out Facility

Location: South Central Texas

Type: Aggregate

Pounds of rebar: 1,983,108 lbs.

Anchor bolts: 3,304

Completion: 2020