Superior Construction Services performed the critical cast-in-place concrete work required to support the spillway’s structural and hydraulic functions. The scope included forming, reinforcing, and placing concrete for the spillway riser structure and associated dam components, ensuring long-term durability under constant water exposure and environmental loading.
Superior installed reinforcing steel, constructed detailed formwork for vertical walls and structural elements, and placed concrete for slabs, walls, and access structures integral to the riser system. The work required precise layout and elevation control to meet strict design tolerances and ensure proper alignment with the spillway’s flow control components.
Through careful coordination and quality execution, Superior delivered the reinforced concrete infrastructure essential to the safety, performance, and longevity of the dam’s spillway system.